New house, going up from the foundation

A ground-up residential build on a lot that falls away steeply at the back, which put a full storey of foundation wall under the house before any of it was visible from the street. It was framed over the winter, closed in, and is being clad through the summer. The sequence below stops where the job currently stands rather than at a handover, because it has not had one yet.

Scope

  • Excavation and foundations
  • Timber framing across three levels
  • Roof structure and covering
  • Sheathing, weatherproofing and siding
  • Interior rough-in
  • Stone fireplace and chimney breast

The sequence

Foundation walls poured and the first two levels framed.
In progress
Foundation walls poured and the first two levels framed.
From the low side of the lot, where the foundation carries a full storey.
In progress
From the low side of the lot, where the foundation carries a full storey.
Roof and dormers framed out, seen from across the road at the end of a day.
In progress
Roof and dormers framed out, seen from across the road at the end of a day.
Sheathed, wrapped and roofed, with the building closed in before the weather.
In progress
Sheathed, wrapped and roofed, with the building closed in before the weather.
Bathroom rough-in, with the shower base formed and waterproofed ahead of tile.
In progress
Bathroom rough-in, with the shower base formed and waterproofed ahead of tile.
The chimney breast built in stacked stone and carried the full height of the room.
In progress
The chimney breast built in stacked stone and carried the full height of the room.
Siding going on the side elevation, worked off a scaffold along the party line.
In progress
Siding going on the side elevation, worked off a scaffold along the party line.
The street elevation as it stands, with the front most of the way closed out.
In progress
The street elevation as it stands, with the front most of the way closed out.